Licensed General Contractor | Palo Alto, CA
ADU Builder in Palo Alto
Envirobuilt Construction designs and builds detached ADUs, attached ADUs, garage conversions and junior ADUs for Palo Alto homeowners. Our office is at 228 Hamilton Ave, so a local team manages your project from the first sketch to the final inspection.

ADU Options for Palo Alto Homes
An accessory dwelling unit (ADU) gives you a separate place to live on your own lot, whether for family, guests or rental income. Palo Alto allows up to two ADUs and one junior ADU on a single-family lot. These are the types we build:
Detached ADU
A new freestanding home in your backyard. Detached ADUs can be up to 800 square feet on any eligible lot, and up to 900 square feet with one bedroom or 1,000 square feet with two or more bedrooms under the city standards.
Attached ADU
A new unit that shares at least one wall with your home. Attached ADUs can be up to 900 square feet with one bedroom or 1,000 square feet with two or more bedrooms.
Garage Conversion
Turn an existing garage into comfortable living space. Palo Alto does not require you to replace the parking you lose. Learn about garage conversions in Palo Alto.
Junior ADU (JADU)
A unit of up to 500 square feet created inside your existing home. The owner must live in either the main home or the JADU.
Not sure which type fits your lot? We review your property during your free consultation and recommend the best option for your goals and budget.
Palo Alto ADU Rules at a Glance
- Number of units: up to two ADUs and one junior ADU on a single-family lot
- Height: detached ADUs up to 16 feet, or 18 feet near major transit
- Setbacks: at least 4 feet from side and rear property lines, and at least 3 feet between a detached ADU and your main home
- Parking: not required for a new ADU, and you do not have to replace the parking when you convert a garage or carport
- Rentals: leases must be 30 days or longer, so short-term rentals are not allowed
- City review: under state law, the city must approve or deny a complete application within 60 days when there is an existing home on the lot
Source: City of Palo Alto J/ADU Guidebook (2025) and California law. Rules change, so we confirm the current requirements for your lot during your free consultation. For the full breakdown, read our guide to Palo Alto ADU rules and permits.
How We Build Your Palo Alto ADU
One licensed team takes your ADU from the first meeting to the final walkthrough.
Free consultation
We visit your property, talk through your goals and budget and check what your lot allows.
Design and engineering
Architectural plans, structural engineering and Title 24 energy calculations for your ADU.
Permits
We prepare and submit your application to the City of Palo Alto Planning & Development Services and answer plan check comments.
Construction
Foundation, framing, utilities and finishes, with regular updates and one point of contact.
Final walkthrough
City inspections and sign-off, then a walkthrough with you before you move in or rent.
ADU Timeline and Cost in Palo Alto
Most of our ADUs are completed in about 6 months, and our ADUs start at $190,000, depending on size and upgrades. Permit fees, utility connections and site conditions also affect your budget, and we talk through them with you during your free consultation.
Want the full breakdown? Read our guide to ADU cost in Palo Alto.
Recent ADU Projects
Here are a few of the ADUs we have built. See more in our project portfolio, including a 1,200 square foot two-bedroom ADU in Newark.



Why Palo Alto Homeowners Choose Envirobuilt
Local Palo Alto Office
Our office is at 228 Hamilton Ave in Palo Alto, so you work with a local team that knows the city permit process.
Licensed General Contractor
CSLB Lic. #900007. One licensed team handles design coordination, permits and construction.
One Point of Contact
Regular updates and one person to call, from your first meeting to the final walkthrough.
Building Since 2007
We have built ADUs and homes across Palo Alto and the Bay Area, including 28 new homes.
Palo Alto ADU FAQ
How many ADUs can I build on my Palo Alto lot?
On a single-family lot, Palo Alto allows up to two ADUs and one junior ADU. Multifamily lots follow different limits. We confirm what your lot allows during your free consultation.
Do I need to add parking for my ADU?
No. Palo Alto does not require parking for a new ADU, and if you convert a garage or carport, you do not need to replace the lost parking spaces. There is one exception: if you build a new home together with an ADU and have no covered parking, you must provide uncovered replacement parking.
Can I rent out my ADU?
Yes. Rentals must be for 30 days or longer, so short-term rentals are not allowed. In general, an ADU cannot be sold separately from the main home.
How long does the city take to review ADU plans?
Under state law, the city must review your application for completeness within 15 business days. It must then approve or deny a complete application within 60 days when there is an existing home on the lot. We handle the plan check comments so your project keeps moving.
How much does an ADU cost in Palo Alto?
Our ADUs start at $190,000, depending on size and upgrades. Our ADU cost guide explains what affects the price.
How long does it take to build an ADU?
Most of our ADUs are completed in about 6 months. The exact timeline depends on the size and design of your ADU and on the city review.
More Services in Palo Alto and Nearby
We also build ADUs in nearby cities:
- ADU Builder in Los Altos
- ADU Builder in Menlo Park
- ADU Builder in Mountain View
- ADU Builder in Atherton
Planning more than an ADU? Explore our other Palo Alto services:
Ready to Build Your Palo Alto ADU?
Call (408) 497-5042 or request a free consultation. We will visit your property, review what it allows and give you a clear plan for design, permits and construction.
Envirobuilt Construction | 228 Hamilton Ave, Ste 311, Palo Alto, CA 94301 | envirobuilt79@gmail.com | CSLB Lic. #900007
