New ADU concrete slab and framed interior with vaulted ceiling

ADU Builder in Mountain View

Envirobuilt Construction is an experienced ADU builder in Mountain View for detached ADUs, attached ADUs, garage conversions and junior ADUs.

Since 2007, we have built ADUs and homes across Palo Alto and the Bay Area. Our office at 228 Hamilton Ave in Palo Alto is a short drive from Mountain View, and our team manages your ADU from design to final inspection.

ADU Options for Mountain View Homes

  • Detached ADUs of up to 850 square feet for a studio or one bedroom, or 1,000 square feet with two or more bedrooms
  • Two-story ADUs: detached or attached ADUs with one or two stories can be up to 28 feet tall
  • Attached ADUs within the same size limits, and no more than 50% of the main home’s floor area
  • Garage conversions that turn existing space into a new home
  • Junior ADUs (JADUs) of up to 500 square feet inside your home

Mountain View’s 28-foot height limit makes two-story ADUs possible, so you can add more living space on a smaller footprint and keep more of your yard.

Completed single-story home with covered front porch and gray siding
ADU construction stages: foundation forms, framing and finished exterior

Mountain View ADU Rules at a Glance

  • Setbacks: 4 feet from side and rear property lines. The front setback follows the zoning district.
  • Parking: none for an ADU without bedrooms, and one space for an ADU with one or more bedrooms, with exceptions in the city code
  • Balconies and roof decks: second-story balconies have size and setback limits, and roof decks are not allowed
  • School fees: apply to new living space over 500 square feet, and you pay them to the school district before the permit is issued
  • Site survey: required when a structure is within 6 feet of a property line or setback

Source: City of Mountain View ADU permit page. Rules change, so we confirm the current requirements for your lot during your free consultation.

The Mountain View ADU Permit Process

The city lists a typical permit timeline of 4 to 6 months. As your ADU builder in Mountain View, we manage each step:

  1. Preliminary review with the Planning Division, which is optional but encouraged
  2. Online submittal and fees: the first plan check takes about 2 weeks
  3. Revisions: we respond to comments, and each review cycle takes about 2 weeks
  4. Additional permits such as fire sprinklers, demolition or excavation, when your project needs them
  5. Construction and inspections, followed by final approval

Most of our ADUs are completed in about 6 months. Our ADUs start at $190,000, depending on size and upgrades.

Mountain View ADU FAQ

Can I build a two-story ADU in Mountain View?
Yes. Detached and attached ADUs with one or two stories can be up to 28 feet tall. Keep in mind that a basement counts as a story.

Do I need parking for my ADU?
An ADU without bedrooms needs no parking. An ADU with one or more bedrooms needs one space, unless an exception in the city code applies.

How much does an ADU cost in Mountain View?
Our ADUs start at $190,000, depending on size and upgrades. Our ADU cost guide explains what affects the price.

Finished gray ADU exteriors with gravel landscaping

Ready to Build an ADU in Mountain View?

Call (408) 497-5042 or contact us for a free consultation. You can also learn more about our ADU construction services. We also build ADUs in Los Altos and Menlo Park.

Scroll to Top